Design, Manufacture & Installation of 20” Air Pipework

Lincoln, UK

Overview

JBD Tritec were engaged by a Aerospace Manufacturing company to replace an existing Air header on a section of their site.

Project Specifics

  • Full pipework design, review, validation & CE marking by JBD Tritec.
  • Fabrication & Installation 200m of 20” A106B SCH 40 Tube c/w 8” Take-offs to existing Equipment.
  • All pipework Site surveyed and fabricated offsite in our Glasgow factory, delivered to site for Install.
  • 10 day pre arranged shut down, completion within 8 days, 2 days ahead of programme