Case Study
At JBD Tritec we have an impressive track record in the provision of engineering products and services within a wide range of sectors.
Services
- Pipework Engineering
- Mechanical Engineering
- Fabrication
- Pump Services
- Valve Services
- Heat Exchangers
- Conveyors
- Electrical Engineering
- Project Management
- Quality
- CDM, Health & Safety
- Case Studies
- Loch Lomond Distillers – Production capacity increase
- Project Tonic – Allied Distillers, Kennington
- Meat Processing Plant, Bridge of Allan
- Chivas Brothers – Relocation of equipment from Kilwinning
- Macfarlan Smith – Pharmaceutical works
- Whyte & Mackay – New access walkways for bottling plant, Grangemouth
- Krones UK – New distillery for William Grants at Girvan
- John Dewars – New bulk blends plant, Glasgow
This involved the supply, fabrication and installation of all stainless steel process and services pipework, support steelwork, platforms and walkways.
Loch Lomond - APV
As an approved supplier for both Invensys APV and Loch Lomond Distillery, we were in a good position to secure the contract for the new evaporator plant at the distillery. This involved the supply, fabrication and installation of all stainless steel process and services pipework, support steelwork, platforms and walkways.
The pipework ranged from ½ inch diameter to 30 inch, we also made bespoke access ways around the new finishers, flash vessel, calandria, etc. Associated works were also carried out on tanks, ladders and lifting beams.

