Case Study
Powermaster were contracted to change out and upgrade the chiller plant at Diageo Shieldhall
Services
- Pipework Engineering
- Mechanical Engineering
- Fabrication
- Pump Services
- Valve Services
- Heat Exchangers
- Conveyors
- Electrical Engineering
- Project Management
- Quality
- CDM, Health & Safety
- Case Studies
- Osprey Corporation – Scrubber Project at Strathclyde Distillery
- Powermaster – New Chiller Installation at Diageo Shieldhall
- Loch Lomond Distillers – Production capacity increase
- Project Tonic – Allied Distillers, Kennington
- Meat Processing Plant, Bridge of Allan
- Chivas Brothers – Relocation of equipment from Kilwinning
- Macfarlan Smith – Pharmaceutical works
- Whyte & Mackay – New access walkways for bottling plant, Grangemouth
- Krones UK – New distillery for William Grants at Girvan
- John Dewars – New bulk blends plant, Glasgow
- Pasteuriser Installation - Various Sites
- Scottish Sea Farms
- Scottish Water
- Corporate Video
Powermaster were contracted to change out and upgrade the chiller plant at Diageo Shieldhall
Powermaster – New Chiller Installation at Diageo Shieldhall
Client:
Powermaster
Client Challenge
Powermaster were contracted to change out and upgrade the chiller plant at Diageo Shieldhall, this involving two chillers, two air cooled condensers, two separate tanks and four pump skids.
JBD Tritec, a Diageo key supplier, were contracted to supply the vessels, pump skids and associated pipework. All pipework was fabricated in thin wall stainless steel, tanks and pump skids were all assembled off site.
With only three days available for the changeover, the prefabrication of all pipework and skids allowed the project to be completed successfully , this allowing the chill filtration to begin again after a weekend break.